DSUR timeline back-planner

Enter a data lock point (DLP). The planner fills in the calendar date of every milestone in the 60-day model from Writing the DSUR (Chapter 3, 3.2; Appendix C.1). Day 0 is the data lock point; only the day-60 limit comes from ICH E2F (§2.2). Adjust the other days to the size of your program, but keep scope, templates and output shells settled before the data lock point.

Inputs

Day 0. The submission deadline is 60 calendar days later.
Dates listed here are flagged like weekends.

Back-planned timeline

Include Milestone Day Date Weekend or holiday Owner What must be ready

The regional requirements row is an addition to the Chapter 3 model (Appendix C.1); it moves the discovery of regional needs to where they cost least. Untick a row to leave it out of the printout and the CSV.

Checks

Planning notes (Appendix C.2)