Selim Medical Press · Medical Device Safety Series, Book 5

Signal Management in Medical Device Vigilance

From complaints and trends to risk file updates and field safety action

Dr. Hafez Selim, MD, PhD

About the book

This book shows how medical device manufacturers turn complaints, returned devices, registry data, clinical follow-up and device-generated data into safety decisions that are timely, based on evidence, and able to withstand audit. It follows the whole signal lifecycle inside the quality system: detection, validation, prioritization, root cause, integrated assessment, risk management file update, field action, communication and closure.

It is written for vigilance and post-market surveillance specialists, complaint-handling leads, safety physicians, risk management engineers, quality and CAPA owners, and regulatory affairs staff. Eight fictional device cases run through the chapters. The book is a companion to Signal Management in Pharmacovigilance by the same author.

What this site contains

1. The toolkit

The 24 editable files (T-1 to T-24) cited in the chapters. Download them one at a time or as a single zip file.

2. The index

The table below maps each file to its chapter and purpose.

4. The Case Lab

The whole ten-step signal process in action: the book's eight cases solved step by step with decide-then-reveal questions, plus a workbench that turns your own signal into a printable record. Open the Case Lab.

3. The web tool

Runs in your browser with nothing to install. It sends no data and stores nothing. Open the tool.

The web tool

Six modules reproduce the book's worked analyses. Each has a "Load book example" button, and every field starts empty.

  • Trend screen: p-chart limits, the 2-of-3 run rule, a standardized CUSUM and an exact binomial check (Chapter 8)
  • Disproportionality and registry O/E: PRR and ROR with 95% intervals, and O/E with exact Poisson intervals and funnel limits (Chapter 9)
  • Time to failure: a life table with Kaplan–Meier survival and Greenwood intervals (Chapter 10)
  • Prioritization: the five-domain scale with bands, the floor rule, urgency triggers and recorded overrides (Chapter 13)
  • Risk-file update: the illustrative 5×5 matrix, with the region before and after the signal (Chapter 18)
  • Decision record: a printable record that keeps the conclusion separate from the status (Chapters 19 and 23)

Open the web tool Open the Case Lab

Educational use. Every tool is an example to adapt to your own quality system. Scores, bands, matrices and thresholds are illustrative company designs, not regulatory requirements. The web tool is not validated software, and a record it produces is not a controlled quality record.

Toolkit index (T-1 to T-24)

T-6, T-7 and T-8 are spreadsheets with live formulas. The other files are Word documents.

All 24 files in one downloadDevice_Signal_Toolkit.zip Download the zip file
Each toolkit file mapped to its chapter and purpose
IDTool and fileChapterFormat
T-1Device signal-management SOP outline and RACIT-01_Signal_Management_SOP_Outline_and_RACI.docx 4DOCX
T-2Data-source inventoryT-02_Data_Source_Inventory.docx 5DOCX
T-3Coding and denominator worksheet (IMDRF coding and denominator selection)T-03_Coding_and_Denominator_Worksheet.docx 6DOCX
T-4Joint clinical–engineering review formT-04_Joint_Clinical_Engineering_Review_Form.docx 7DOCX
T-5PMS plan trend-methodology section with threshold justificationT-05_PMS_Plan_Trend_Methodology_Section.docx 8DOCX
T-6Trend calculator: p-chart and CUSUMT-06_Trend_Calculator_pChart_CUSUM.xlsx 8XLSX
T-7Disproportionality and registry O/E calculatorT-07_Disproportionality_and_Registry_OE_Calculator.xlsx 9XLSX
T-8Time-to-failure analysis plan and Kaplan–Meier templateT-08_Time_to_Failure_Plan_and_KM_Template.xlsx 10XLSX
T-9Special-situation checklist and AI performance-monitoring planT-09_Special_Situations_and_AI_Monitoring_Plan.docx 11DOCX
T-10Validation memoT-10_Validation_Memo.docx 12DOCX
T-11Prioritization matrix aligned with ISO 14971T-11_Prioritization_Matrix_ISO14971.docx 13DOCX
T-12Signal assessment protocolT-12_Signal_Assessment_Protocol.docx 14DOCX
T-13Event adjudication guide and line-listing templateT-13_Event_Adjudication_Guide_and_Line_Listing.docx 15DOCX
T-14Root-cause investigation and human-factors checklistT-14_Root_Cause_and_Human_Factors_Checklist.docx 16DOCX
T-15Totality-of-evidence and device-causality templateT-15_Totality_of_Evidence_and_Device_Causality.docx 17DOCX
T-16Risk management file update worksheetT-16_Risk_File_Update_Worksheet.docx 18DOCX
T-17Action-selection matrix and FSCA decision recordT-17_Action_Selection_Matrix_and_FSCA_Decision_Record.docx 19DOCX
T-18Device benefit–risk worksheetT-18_Device_Benefit_Risk_Worksheet.docx 20DOCX
T-19Field safety notice checklistT-19_Field_Safety_Notice_Checklist.docx 21DOCX
T-20Post-market review board charter, agenda, decision request and minutesT-20_Review_Board_Charter_Agenda_Decision_Request_Minutes.docx 22DOCX
T-21Signal record, closure memo and reopening review templatesT-21_Signal_Record_Closure_Memo_Reopening_Review.docx 23DOCX
T-22Cross-document reconciliation checklistT-22_Cross_Document_Reconciliation_Checklist.docx 24DOCX
T-23Audit and inspection readiness checklistT-23_Audit_and_Inspection_Readiness_Checklist.docx 25DOCX
T-24KPI dictionary and AI use-case validation checklistT-24_KPI_Dictionary_and_AI_Validation_Checklist.docx 26, 27DOCX

Using the files

Each file is a starting point. Before you use one in production, bring it under your document control, replace the example thresholds and scales with the values in your own PMS plan and risk management file, and validate any spreadsheet you rely on for decisions. All case names in the book and the files (Suturex, Glucalyn, Tessora, Kestran, Orvana, Calvenox, Lumora, Neoflo and Brevant) are fictional composites. Their numbers are illustrative.

Regulatory statements in the book reflect the law as of September 2026. Check current texts before relying on them.

Change log

Version 1.0.0 (16 September 2026)
First release. Web tool with six modules: trend screen, disproportionality and registry O/E, time to failure, prioritization, risk-file update and decision record. Toolkit index for T-1 to T-24, with a zip download.

The full change log is in the repository.